Grodziszcze 24 Enquire

For sale · Grodziszcze, Grębocice municipality

61 ares at the end of the road.
Beyond – only fields and forests.

399 000 zł
approx. €91,100 (NBP exchange rate of 9 Oct 2026)

A brick house with a half-timbered section, an outbuilding and almost 30 ares of your own meadow.

  • ~61 a plot
  • ~32 a in the local zoning plan (MPZP)
  • ~102 m² footprint + attic
  • road by the house and field track by the meadow

plot boundary (approximate)

Why this place

Space you can't buy in the city

01Where the road ends, open space begins

The last house on this road – beyond it only field tracks. Neighbours on one side only. Privacy, quiet and a sky full of stars.

02Approx. 61 ares in one piece

As much as several typical suburban plots. Room for a garden, playground and leisure – away from other people's windows.

03Approx. 32 ares in the local zoning plan (MPZP)

The front part is covered by the local plan – permitted use includes housing.

04An investment for decades – 3.2 km from Poland’s deepest shaft

The "Retków" shaft is being built nearby and is set to become the deepest mine shaft in Poland. The project to mine the "Retków-Grodziszcze" deposit has EU strategic project status and is planned with a horizon to 2055. Details, sources and map

05Three towns within 20–30 minutes

Polkowice, Głogów and Lubin – schools, shopping, doctors and jobs within a short drive.

06Live and work in one place

The local plan allows, besides the house, a small multi-family building (up to 4 flats), services, a workshop or studio in a building of up to 200 m², and non-nuisance agricultural activity in a building of up to 400 m² (in line with the plan). Whether a specific activity is possible depends on its type, the project parameters and the requirements of the plan and regulations.

07A house for generations

Old, massive beams and brick – most of the beams and walls are intact. Work already done on the foundations, reinforcement, concrete and walls. The interior has been cleared practically down to bare brick – ready for you to plan the renovation.

08Almost 30 ares of your own meadow

Approx. 29 ares of farmland / meadow at the back of the plot – room for a pasture, paddock, orchard or simply your own open space. Gardens and crops do well here, and there are several old fruit trees on the property.

09Road by the house and a field track by the meadow

A paved road by the house – even heavy concrete mixers have driven along it. A field track runs along the meadow side.

Grodziszcze is a small village where people know each other. Neighbours are open and helpful when needed – and day to day everyone has their peace.

A small, quiet and friendly community – without the anonymity of a housing estate.
📍 Directions in Google Maps
Aerial view of the area – fields and forests around Grodziszcze Grodziszcze from above

Lower Silesia, the Głogów · Polkowice · Lubin area.
Fields, meadows and forests.

Grodziszcze – a small village.
The property is right at its edge.

About 61 ares. House and outbuilding by the road,
behind them a meadow up to the fields.

Key facts

Plot areaapprox. 61 aresapprox. 6,080 m², ~140 × 40–48 m
Part in the local zoning plan (MPZP)approx. 32 arespermitted use incl. housing
Farmland / meadowapprox. 29 aresback part of the plot
Houseapprox. 102 m²footprint; ground floor + high attic, to renovate
Buildingshouse + outbuildingformer stable
Structureold, massive beamsmostly preserved; some to be strengthened or replaced. Two chimneys – to be restored.
Work donefoundations, wallsreinforcement and concrete; interior cleared practically to bare brick
To dofull renovationnew roof covering (currently plain “beaver-tail” clay tiles), strengthening or replacing some beams, brickwork repairs, restoring the half-timbering on the former stable side; inside from scratch – floors, utilities and heating
Accessroad by the housepaved; a field track on the meadow side
Watermains water connectionto be replaced – old pipes damaged by frost; there is also a well on the property (needs deepening)
Sewagemanhole on the propertyconnection still to be made
Electricityconnection in placemeter to be reinstalled under the operator's procedure
Gasgas connectiongas meter box on the building; supply to be started under the network operator’s procedure
Internetmobile 4G / 5Gno fixed-line connection; nearest masts: T-Mobile – Grębocice, approx. 6 km (4G and 5G), Play and Orange – Rudna, approx. 6–7 km. Signal strength in the house is worth checking with a phone on site. (UKE, 25 Sep 2026; internet.gov.pl)
Legal statusland registerestablished; no mortgage – documents available at the viewing
Availabilityimmediatelyviewings by appointment
Municipal general plan (draft)house, flats or services at the front, view of the fields at the backthe front part of the plot is designated for, among other things, farmstead buildings, housing (including multi-family) and services; the back part (approx. 47%) stays agricultural with no new buildings – the view of the fields remains. No wind turbines or biogas plants are planned in the municipality. Draft general plan, May 2026
Mining groundwithin the mining ground of KGHM’s new mineThe entire plot lies within the "Retków-Grodziszcze" mining area and mining ground (licence no. 5/2026 of 31 Aug 2026), as do Grębocice, Krzydłowice and Retków. The copper deposit lies more than 1 km underground. MIDAS (PIG), as of 29 Oct 2026 · What it means · Map
Flood riskoutside hazard zonesthe plot is not in a flood hazard area; the nearest one is approx. 10 km away (ISOK flood hazard maps, Wody Polskie, checked 11 Oct 2026).
Show the local plan on the mapHide plan map
Plot
The front part of the plot (approx. 32 ares) lies within zone KR.7.MP of the local zoning plan (Grębocice Municipal Council resolution no. LX/238/2010 of 10 June 2010, amended on 23 June 2016 – resolution no. XXX/121/2016). The plan designates MP zones for housing and services; it allows, among other things, farmstead buildings, service buildings and non-agricultural production in a building of up to 200 m² usable floor area (these uses together up to 49% of the zone). The back part of the plot (approx. 29 ares) lies outside this plan. House no. 24 is marked in the plan with the symbol kr.3.x – protected as heritage under the plan: renovation must, among other things, keep the building's form, roof shape and facade character.
Source: text of the resolution (Grębocice municipality), 2016 amendment, plan drawing – plan map service (National Integration of Local Plans, GUGiK); photo: Geoportal.gov.pl / GUGiK; as of 6 Oct 2026. For illustration only – the binding documents are the plan extract and map extract issued by Grębocice Municipal Office.

Condition of the building: most beams and brick walls are intact; some beams need strengthening or replacing, and on the former-stable side parts of the brickwork need rebuilding and the half-timbering restoring. The scope is best assessed when planning the renovation.

The house is listed in the municipal register of monuments and protected under the local plan (renovation rules – see the description under the plan map above). The owner holds a written heritage-conservation approval for work on the house – available for interested buyers to see.

Areas are approximate and will be confirmed by documents at sale.

Possible support for renovation
  • Czyste Powietrze ("Clean Air") – grant for insulation, windows and replacing the heating in a single-family house; for a comprehensive thermal upgrade up to 66k, 99k or 135k PLN, depending on income.
  • Thermal-modernisation tax relief in Polish income tax – deduction of thermal-upgrade expenses of up to 53k PLN per taxpaying owner (for the part of the costs not covered by grants).
  • Mikroretencja (micro-retention) – grant of up to 90% of costs, max. 8k PLN, for collecting and using rainwater (tanks, soakaways, watering) at an occupied single-family house; applications until the end of 2027 or until funds run out.
  • Mining ground – the mining company is liable for damage caused by mining, and the same rules cover preventing damage, e.g. securing the building (Polish Geological and Mining Law, Art. 144–150).

Conditions and amounts depend on the programme and the buyer’s situation; as of 11 Oct 2026. For guidance only, not legal or tax advice. Details via the link at each item.

Area and investments

Village calm – with the heart of the Copper Basin next door

1–2 kmForestextensive forests towards Ścinawa
8 kmGrębociceapprox. 15 min
16 kmPolkowiceapprox. 20 min
19 kmGłogówapprox. 25 min
24 kmLubinapprox. 27 min
50 kmLegnicaapprox. 45 min
130 kmWrocławapprox. 1 h 45 min

Distances and driving times, approximate.

Everyday life

  • Grębocice – approx. 8–9 km, approx. 15 min: primary school, kindergarten, health centre, pharmacy, post office and shops (incl. Dino).
  • Rudna – approx. 7–8 km, approx. 12 min: school, kindergarten, pharmacy and shops (incl. Biedronka, Dino).
  • Free bus – municipal line no. 2 runs through Grodziszcze to Grębocice (route map), and a free line also runs from Grębocice to Polkowice (municipal info).
  • Train – stations Grębocice (approx. 8 km, approx. 13 min) and Rudna Gwizdanów (approx. 9 km, approx. 11 min) on line no. 273 – trains to Głogów, Legnica, Wrocław and Zielona Góra, among others.

Driving distances and locations from OpenStreetMap, approximate; bus information from the Grębocice municipality website, rail from the draft general plan; as of 13 Oct 2026.

Work within reach

Grodziszcze lies in the Copper Basin – one of Poland's strongest economic regions. Within about 30 minutes' drive are the operations of KGHM Polska Miedź (including in Polkowice, Lubin and Głogów) and the special economic zone in Polkowice with large industrial employers.

For KGHM employees: the "Retków" shaft – approx. 12 min by car, plants in Polkowice, Lubin and Głogów – 20–30 min, and a free bus runs from Grębocice to Polkowice. A house at the end of a side road means quiet – even when you need to sleep after a night shift.

What's happening nearby

  1. under wayKGHM "Retków" shaft – Poland’s deepest, approx. 3.2 km from the plot
    Plot"Retków" shaftapprox. 5.8 km(approx. 12 min)approx. 4.7 km(approx. 12 min)"Retków-Grodziszcze" mining ground
    copper deposit, mining area and mining ground (in this section the boundaries coincide)   shaft site   plot
    via Stara Rzeka – approx. 5.8 km   via Proszyce – approx. 4.7 km, partly gravel  (both approx. 12 min)
    Photo: Geoportal.gov.pl / GUGiK; boundaries: MIDAS (PIG), as of 29 Oct 2026; shaft: Chancellery of the PM; routes: © OpenStreetMap. Approximate.

    It is set to be Poland’s deepest shaft (approx. 1,360 m). According to KGHM it will cost approx. 3 billion PLN and take approx. 15 years to build; first surface facilities are announced for 2027. KGHM holds the environmental decision (19 Dec 2025) and licence no. 5/2026 (31 Aug 2026, valid until 23 Sep 2076); since 9 Oct 2026 it has EU strategic project status. Mining is planned with a horizon to 2055.

    "(…) Polish companies will be responsible for practically the whole of this investment. It will provide work for over ten thousand people for years." (translation)

    — Donald Tusk, Prime Minister of Poland, 14 November 2025, during a visit to the "Retków" shaft construction site in Grębocice municipality. Source: KGHM Polska Miedź press release of 14 Nov 2025

    What it means for the plot: work and investment nearby, and peace and quiet at the same time – the shaft site is approx. 3.2 km away (approx. 12 min by car), and the plot is not covered by the draft local plan for the shaft (version of 23 Oct 2026; the nearest covered areas are over 1 km away). It lies within the mine’s mining ground – like the whole area.

    Sources: KGHM, 14 Nov 2025 · KGHM, 9 Oct 2026 · RDOŚ Wrocław, 23 Dec 2025 · shaft plan, 23 Oct 2026 · mining ground: MIDAS (PIG), 29 Oct 2026 · licence 5/2026: PIG register

  2. existing"Żelazny Most" tailings facility – approx. 2.3 km south of the plot
    Show the facility and the plot on the mapHide map
    Plotapprox. 2.3 kmŻelazny MostSouthern Quarter
    "Żelazny Most" facility   plot
    Dust lifted from the edges in dry weather. The more specks and the further they travel, the more often the wind carries dust that way – mainly east and north-west, rarely towards the plot.Photo: Geoportal.gov.pl / GUGiK; outline: © OpenStreetMap; wind: ERA5 (Copernicus) via Open-Meteo, 2016–2025, hours with wind from 4 m/s and no rain. Approximate.

    KGHM flotation tailings facility (approx. 16 km², since the 1970s), in operation at least until 2037. The dams are being raised gradually (to 205 m a.s.l.) within the areas set out in the local plans – the facility grows upwards, not towards the plot; the new Southern Quarter was built on the opposite side. In between are fields and forest.

    Dust
    • What dust is it? Fine sand from the dried-out edges of the facility – what remains after copper ore processing.
    • When does it lift? Only when it is dry and there is a noticeable wind (from approx. 4 m/s – leaves and twigs constantly moving). Not in rain, snow or light wind.
    • Does it reach the plot? Only when the wind blows from the facility, i.e. from the south. Such wind – strong enough and in dry weather – occurs about 100 hours a year in total (approx. 1% of the time), usually for 2–3 hours at a time. Most often the wind blows from the west and carries dust east towards Rudna – past the plot.
    • What does KGHM do? It sprinkles the edges with water, covers them with binding agents, sows grass on the slopes and stops work in strong wind. These are obligations under the environmental decision.
    Air measurements
    • Dust in the air (PM10) On average 20 µg/m³ against a limit of 40 – half the permitted level. Days with elevated dust: 8 a year, 35 are allowed.
    • Metals in dust Arsenic – about half the limit (more than in big cities, as this is a copper region), lead and cadmium – a few per cent of it. This matters, because these are the metals people near mines worry about most.
    • Soil Tests around the facility (WIOŚ, 2013–2014) found no exceedances of copper, cadmium or lead.
    • Where is the data from? From the nearest state monitoring station (GIOŚ, Polkowice, approx. 11 km), year 2025. This shows the air in the area, not a measurement at the facility itself – KGHM runs that and reports it to the municipalities every year.
    Compared with big cities (2025)
    average PM10 dustlimit 40days of elevated dust35 allowed
    Polkowice – nearest to the plot208
    Warsaw2116
    Wrocław2514
    Kraków2527

    Average of all GIOŚ stations in each city; µg/m³.

    Safety

    The dams are monitored continuously; an independent expert assesses them every year and an international expert panel oversees safety. Like every large reservoir, the facility has a municipal emergency plan for a dam failure – it also covers Grodziszcze.

    Source: Grębocice municipality evacuation plan, 2018

    The house has a mains water connection (to be replaced); well water is worth testing before use.

    Sources: general plan, May 2026 · environmental decision, 15 May 2025 · GIOŚ, Polkowice, 2025 · municipal environmental forecast (soils) · TVP Wrocław

  3. in procedurePlanned solar farm 'Krzydłowice III'
    Show the plots on the mapHide plot map
    Plot Plots in the application
    farm plots per the application   cables and roads   plot for sale
    Photo: Geoportal.gov.pl / GUGiK; plots: land register and municipal notices. Does not show the panel layout.

    The plot itself is not included in the solar farm application. According to the application, the nearest plots for panels are approx. 350 m away, and plots for associated infrastructure approx. 75 m. The panel layout is not yet known. The environmental procedure for the farm of up to 185 MW (Elawan Energy Polska, approx. 216 ha in the Krzydłowice area) is under way; the authority has named 30 Nov 2026 as the planned date.

    Source: Grębocice municipality BIP, 7 Sep 2026

  4. plannedNew pavement, cycle path and street lighting in Grodziszcze
    Plot Grodziszcze County road 1133D
    county road no. 1133D (current road strip, approx. 190 m from the plot) – planned upgrade   plot
    Photo: Geoportal.gov.pl / GUGiK; road strip: land register.

    Agreement between Polkowice county, Grębocice municipality and KGHM of December 2021: 18.45 million PLN from KGHM for upgrading the county road through the village – with a pavement, cycle path and lighting. The house stands away from it, at the end of a side road (approx. 190 m from the plot) – through traffic does not pass it, yet the main road is close by.

    Source: Polkowice county, 1 Dec 2021

  5. under wayKrzydłowice bypass

    The new road, approx. 1.6 km with a cycle path, running along the west side of neighbouring Krzydłowice, will make getting around the area easier. Contract with the contractor (STRABAG) signed on 7 Sep 2026, value approx. 8 million PLN.

    Sources: Grębocice municipality, 8 Sep 2026 · route sketch (Grębocice municipality, 6 Feb 2025)

Information on investments comes from the public sources given (as of 6–29 Oct 2026) and is for information only – the seller is not its author and is not responsible for later changes to plans, timing or scope, which are decided by the developers and authorities. Please check the current status at the source.

How it looks today

The photos show the actual condition of the property, without embellishment.

House and outbuilding – panorama
House and outbuilding

Frequently asked questions

Can I move in straight away?

No – the house needs renovating. The interior has been cleared practically to bare brick and work has been done on the foundations and walls; the roof, some beams and the utilities still need doing. Electricity: connection in place, meter to be reinstalled; gas: connection with a meter box on the building; water: connection to be replaced.

Is the price negotiable?

The asking price is 399 000 zł. You can send your own proposal through the form – it is not binding and we consider every one.

What does buying cost on top of the price?

PCC tax – 2% of the price (at 399,000 zł that is 7,980 zł) – by law it is paid by the buyer; first-time home buyers may be exempt. On top of that come notary and court fees, customarily paid by the buyer.

Can I buy with a mortgage?

Yes. The bank values the property through its own appraiser – we will arrange a viewing for them. As the house needs a full renovation, it is worth asking the bank about a loan for purchase plus renovation (paid out in tranches); terms depend on the bank.

Can a buyer from abroad purchase it?

Citizens of the EU, EEA and Switzerland buy on the same terms as Poles. People from other countries (e.g. Ukraine) generally need a permit from the Polish Ministry of the Interior (MSWiA) – this does not apply, among others, to those who have lived in Poland for at least 5 years since obtaining a permanent residence permit or EU long-term resident status. If the buyer does not speak Polish, a sworn translator attends the notarial deed. More: gov.pl

How do viewings work?

Write via the form – we’ll reply and arrange a time. The property is available immediately.

What documents are there?

The property has a land register (księga wieczysta) and no mortgage; documents can be viewed during the viewing. Extracts from the local plan are issued by the Grębocice Municipal Office. The whole property is smaller than 1 ha, so the buyer does not need to be a farmer (Polish Agricultural System Act, Art. 2a(3)(1a)).

What can be built here?

The front part (approx. 32 ares) lies in the local plan in zone KR.7.MP – it allows, among other things, a single-family house, a small multi-family building (up to 4 flats), farmstead buildings, services and a workshop in a building of up to 200 m². The back part (approx. 29 ares) is agricultural land outside the plan; in the draft general plan it is an open zone with no new buildings.

Under the plan (as amended in 2016), buildings may cover up to 60% of a building plot, and new building plots can be from 400 m² (single-family house) or 800 m² (farmstead). A specific concept is best agreed with the municipality and the heritage conservator.

The plot lies within mining ground – what does it mean?

In the Copper Basin this is everyday reality: the towns of Polkowice and Lubin and the neighbouring Grębocice, Krzydłowice and Retków all lie within mining ground. The plot belongs to the "Retków-Grodziszcze" mining ground, designated in 2026 for KGHM’s new mine. The deposit lies more than 1 km underground, and its extraction is only being prepared – the key investment is the construction of the "Retków" shaft.

What does it give the owner? Mining ground does not rule out living, renovating or building. The mining company is liable for damage caused by mining, and the same rules cover preventing damage (Polish Geological and Mining Law, Art. 144–150).

Why is it an opportunity? The plot lies within reach of one of the largest industrial investments in Poland: the shaft is expected to cost approx. 3 billion PLN, construction will take approx. 15 years, and the project has EU strategic project status. KGHM will also fund the modernisation of the road through the village (18.45 million PLN).

Where can you check it? The licence and the mining ground boundaries are shown in the register of mining areas (PIG). In 2026 KGHM commissioned an assessment of how resistant buildings in Grodziszcze, Krzydłowice and Proszyce are to mining influences (municipality notice, 7 Jul 2026). When planning the renovation, it is worth asking KGHM for information on the mining conditions for this property – we will gladly help with that. Sources and map – in the section on the "Retków" shaft.

Is there a flood risk?

From rivers – no: according to the ISOK maps the plot lies outside flood hazard areas; the nearest is approx. 10 km away. On Żelazny Most – see the next question.

What about Żelazny Most?

It is KGHM’s flotation tailings facility, approx. 2.3 km south of the plot. It grows upwards (dam raising), not towards the plot. The most frequent wind blows from the west, i.e. not towards the plot, and air measurements in the area are within the limits. The facility is monitored continuously and – like every large reservoir – has a municipal emergency plan. Details, figures and sources in the “Area and investments” section.

Are tremors felt here?

Mining-related tremors occur in the Copper Basin – a phenomenon known throughout the region. The mining company (KGHM) is liable for any damage to buildings, and extraction of the "Retków-Grodziszcze" deposit beneath the area around the plot is only being prepared.

What about the solar farm nearby?

A procedure is under way for the "Krzydłowice III" farm. The plot itself is not included in the application; according to it, the nearest plots for panels are approx. 350 m away, and plots for associated infrastructure approx. 75 m. Details, sources and map in "Area and investments".

Want to see it in person?

Write via the form – we'll reply and arrange a viewing.

Ask a question or propose a price
Ask or propose a price